Engineering Question

2558

Conditions:

A backhoe weighing 22 tons is on top of a lowboy trailer and heading east on the Trans-Canada Highway in Alberta. The extended shovel arm is made of hardened refined steel and the approaching overpass is made of commercial-grade concrete, reinforced with 1 inch steel rebar spaced at 6 inch intervals in a criss-cross pattern layered at 1 foot vertical spacing.

Solve:

When the shovel arm hits the overpass, how fast do you have to be going to slice the bridge in half?  (Assume no effect for head wind and no braking by the driver)

backhoe1

backhoe2

This far!!!

backhoe3

Conditions: A backhoe weighing 22 tons is on top of a lowboy trailer and heading east on the Trans-Canada Highway in Alberta. The extended shovel arm is made of hardened refined steel and the approaching overpass is made of commercial-grade concrete, reinforced with 1 inch steel rebar spaced at 6 inch intervals in a criss-cross pattern layered at 1 foot vertical spacing. Solve: When the shovel arm hits the overpass, how fast do you have to be going to slice the bridge in half?  (Assume no effect for head wind and no braking by the driver) This far!!!

Engineering Question

User Rating: Be the first one !
0


Related Articles & Comments

Comments are closed.